2007
|
|
|
| |
CLIENT |
INVESTOR |
|
| |
GASCO
|
GASCO RUWAIS |
Installation of cable and temperature elements
(Mat .procurement, Installation, Commissioning) |
| |
GOGAS |
TAKREER |
6 inch Bypass for kerosene feed coalescer outlet to filter in Merox unit at Abu Dhabi Refinery (Installation of cable and temperature elements) |
| |
TRANSCO |
TRANSCO AD |
Calibration of measuring equipments |
| |
GASCO |
GASCO RUWAIS |
Replacement of Furnace Cables ( Mat. procurement, Installation, Commissioning) |
| |
MARZ GAUTSCHI |
DUBAL |
Emergency lighting ( Design, Procurement, Installation & Commissioning) |
| |
HONEYWELL M.E.
|
ARAMCO, KSA |
Marshalling Cabinets (12)( Procurement, Installation) |
| |
HONEYWELL M.E.
|
PDO OMAN |
Marshalling cabinets (21)( Procurement, Installation) |
| |
HONEYWELL M.E. |
KJO, KSA |
Marshalling Cabinets (15)( Procurement, Installation) |
| |
HONEYWELL |
SINOHYDRO OMAN |
Marshalling & RTU cabinets ( 49)( Procurement, Installation) |
| |
ISCCO |
TAKREER Umm Al Nar |
Electrical & instrumentation works related to addition of instruments at Abu Dhabi Refinery |
| |
VECO |
ADGAS |
Supply of cable trays( Procurement & supply) |
| |
SIEMENS KSA |
ARAMCO |
Fail Safe PLC/Remote Terminal Units for Gas Wells(Procurement, assembly, packing and delivery of 65 |
| |
EMERSON |
LAYYAH Power Plant(SEWA) |
Upgrade & addition of control system in unit No. 6( Procurement , installation and commissioning complete instrumentation on block 6 in power station – upgrade by OVATION system) |
| |
2008
|
|
|
| |
|
|
|
| |
UTS KENTZ |
GASCO HABSHAN |
Supply, Assembly of Local Control Panels.( Procurement, Assembly & Field Installation) |
| |
GASCO |
GASCO HABSHAN |
Upgrade of THAMAMA C boilers obsolete control System
( EPC contract – ABB Control System) |
| |
ADNOC Distribution |
ADNOC Distribution |
Vapour Instrumentation Installation |
| |
ISCCO |
GASCO ASAB |
Enhancement of existing water distribution facilities
in Gasco Asab – Electrical & Instrumentation Works ( EPC Contract)
|
| |
HONEYWELL M.E. |
ADGAS |
Marshalling cabinets ( 25)( procurement & Assembly)
|
| |
HGS UK |
DUBAL |
Cast house CMAC Replacement( Procurement & Installation) |
| |
HONEYWELL M.E. |
PDO Oman |
Marshalling Cabinets (5) + FAT(Procurement, Assembly & Support)
|
| |
GASCO |
GASCO RUWEIS |
Long Term Calibration Services
(3 years Contract for Calibration services for Electrical Department in Gasco Ruweis)
|
| |
GOGAS |
ZADCO |
Helicopter Jet Fuel Daily Jettison System(Installation works)
|
| |
HGS UK |
DUBAL |
Common Services Panel (Procurement & Assembly)
|
| |
HONEYWELL M.E. |
TOTAL ABK |
Cabinets (5) , Consoles (6)(Procurement & Assembly)
|
| |
ADNOC Distribution |
ADNOC Distribution |
Fire Water System Automation (EPC Contract)
|
| |
HONEYWELL M.E. |
FERTIL |
Marshalling Cabinets (8) & Console (1)(Procurement & Assembly)
|
| |
MIRFA POWER Co. |
MIRFA POWER CO. |
Spare parts for Instrumentation (Procurement & Supply) |
| |
UTS |
GASCO |
Lighting Panel (Procurement & Assembly) |
| |
HONEYWELL M.E. |
BOROUGE |
Cabinets Site Installations(Installation works) |
| |
HONEYWELL M.E. |
DUGAS |
Cabinets Site Installations (Installation works) |
| |
|
|
|
| |
|
|
|
| |
2009 |
|
|
| |
|
|
|
| |
MIRFA POWER Co |
GASCO HABSHAN |
Supply, Assembly of Local Control Panels.( Procurement, Assembly & Field Installation) |
| |
HONEYWELL M.E. |
GASCO HABSHAN |
Upgrade of THAMAMA C boilers obsolete control System (EPC contract – ABB Control System) |
| |
HONEYWELL M.E. |
ADNOC Distribution |
Vapour Instrumentation Installation |
| |
MIRFA POWER CO. |
GASCO ASAB |
Enhancement of existing water distribution facilities
in Gasco ASAB – Electrical & Instrumentation Works ( EPC Contract) |
| |
TECHNICAS REUNIDAS |
ADGAS |
Marshalling cabinets (25)(Procurement & Assembly) |
| |
HONEYWELL |
DUBAL |
Cast house CMAC Replacement( Procurement & Installation) |
| |
HONEYWELL |
PDO Oman |
Marshalling Cabinets (5) + FAT ( Procurement, Assembly & Support) |
| |
iTM |
GASCO RUWEIS |
Long Term Calibration Services( 3 years Contract for Calibration services for Electrical Department in Gasco Ruweis)
|
| |
GASCO |
ZADCO |
Helicopter Jet Fuel Daily Jettison System(Installation works) |
| |
TARGET |
DUBAL |
Common Services Panel(Procurement & Assembly) |
| |
GASCO |
TOTAL ABK |
Cabinets (5) , Consoles (6)( Procurement & Assembly) |
| |
SYSTEM& EQUIP. |
ADNOC Distribution |
Fire Water System Automation ( EPC Contract) |
| |
ADNOC DISTR. |
FERTIL |
Marshalling Cabinets (8) & Console (1)(Procurement & Assembly) |
| |
2010 |
|
|
| |
|
|
|
| |
ADNOC DISTR. |
ADNOC DISTR. |
LPG Plant Automation Al Ain
( Procurement, Assembly & Installation of Cabinets |
| |
AIMS |
GASCO Ruweis |
Analyzers on Train 3
(Installation & Commissioning
|
| |
INTERGULF |
GASCO ASAB |
F&G System in IT Building Gasco Asab (EPC) |
| |
CHINA PETROLEUM ENG & CONSTR. Co. |
ADCOP Project (IPIC) |
Electrical Bulk Supply ( Procurement of
ENG & CONSTR. Co.Lighting poles & accessories) |
| |
ISCCO |
GASCO |
New Condensate Line from THC( EPC – e&i part) |
| |
MIRFA POWER CO. |
MIRFA POWER CO. |
Calibration of instrumentation & electrical equipment( calibration services) |
| |
BOROUGE |
BOROUGE |
Provision of PTs for feed pumps ( Supply, Installation & Commissioning) |
| |
HONEYWELL |
ARAMCO |
|
| |
ADNOCT DISTR. |
ADNOC DISTR. |
PLC Panel assembly and installation, Mussafah
|
| |
ADNOCT DISTR. |
ADNOC DISTR. |
Server Cabinet assembly & Installation, RAK |
| |
GASCO |
GASCO, ASAB |
Server cabinet assembly and Installation |
| |
CHINA PETROLEUM ENG & CONSTR. Co |
ADCOP Projec(IPIC) |
Cable Tags Embossing Services (200.000 tags) |
| |
|
|
|
| |
2011
|
|
|
| |
|
|
|
| |
EMERSON PM |
ADNOC DISTRIBUTION |
Installation of ESD System |
| |
GASCO |
GASCO HABSHAN |
Replacement of Boilers Controls in IES 9 – Feed
Study |
| |
HGS |
TATWEER Bahrain |
F&G Project Tatweer – Cabinets (14) for Rockwell
Automation |
| |
ISCCO |
GASCO |
New Condensate Line – Detail Engineering |
| |
CHINA PETROLEUM
ENG & CONSTR. CO. |
ADCOP PROJECT(IPIC) |
Supply of additional Jbs for MOT & IPS (282 pcs) |
| |
CHINA PETROLEUM ENG & CONSTR. CO. |
ADCOP PROJECT(IPIC) |
Installation & Commissioning of 20 m lighting poles
(81 pcs) |
| |
CHINA PETROLEUM ENG & CONSTR. CO. |
ADCOP PROJECT(IPIC) |
Supply of LV DBs for MOT/IPS Stations (148 pcs) |
| |
EMERSON PM |
EMERSON PM |
Building of DEMO Control cabinets (2) for EPM
showroom, installation works in EPM Showroom |
| |
MIRFA POWER CO. |
AL MIRFA POWER CO. |
Design, Procurement Installation & Commissioning
of CCTV system in Admin building |
| |
FERTIL |
FERTIL |
Manpower supply ( instrument technicians) |
| |
HME |
ZADCO |
ZAKUM PH II B Panel Works ( 56+14 Cabinets) |
| |
MIRFA POWER CO. |
AL MIRFA POWER Co. |
Electrical Test Equipment Supply |
| |
|
|
|